Planning and Managing the “Cost of Compromise” for AV Retention and Access
Metadata
- Publisher
- SMPTE
- Doc Type
- Journal Article
- Article Type
- orig-research
- Abstract
- Long-term retention and access to audiovisual (AV) assets as part of a preservation strategy inevitably involve some form of compromise in order to achieve acceptable levels of cost, throughput, quality, and many other parameters. Examples include quality control and throughput in media transfer chains; data safety and accessibility in digital storage systems; and service levels for ingest and access for archive functions delivered as services. We present new software tools and frameworks developed in the PrestoPRIME project that allow these compromises to be quantitatively assessed, planned, and managed for file-based AV assets. Our focus is how to give an archive an assurance that when they design and operate a preservation strategy as a set of services, it will function as expected and will cope with the inevitable and often unpredictable variations that happen in operation. This includes being able to do cost projections, sensitivity analysis, simulation of “disaster scenarios,” and to govern preservation services using service-level agreements and policies.
- Publication Date
- 2012-01-01
- DOI
10.5594/j18133- Link
- https://doi.org/10.5594/j18133
- Author(s)
- M. J. Addis, M. Jacyno, M. Hall-May, M. McArdle, S. C. Phillips
Source Data (JSON)
Full registry record with provenance metadata. Open directly: /api/doc/10.5594-j18133.json
Reference this Doc
Plain text (ISO 690 compliant)
Preview:
M. J. Addis, M. Jacyno, M. Hall-May, M. McArdle, and S. C. Phillips; Planning and Managing the “Cost of Compromise” for AV Retention and Access, SMPTE Journal ( Volume: 121, Issue: 1, 2012); SMPTE, 2012. Available at https://doi.org/10.5594/j18133
Snippet:
M. J. Addis, M. Jacyno, M. Hall-May, M. McArdle, and S. C. Phillips; Planning and Managing the “Cost of Compromise” for AV Retention and Access, SMPTE Journal ( Volume: 121, Issue: 1, 2012); SMPTE, 2012. Available at https://doi.org/10.5594/j18133
HTML (ISO 690 compliant)
Preview:
M. J. Addis, M. Jacyno, M. Hall-May, M. McArdle, and S. C. Phillips; Planning and Managing the “Cost of Compromise” for AV Retention and Access, SMPTE Journal ( Volume: 121, Issue: 1, 2012); SMPTE, 2012. Available at https://doi.org/10.5594/j18133
Snippet:
<span class="citation">M. J. Addis, M. Jacyno, M. Hall-May, M. McArdle, and S. C. Phillips; <cite>Planning and Managing the “Cost of Compromise” for AV Retention and Access</cite>, SMPTE Journal ( Volume: 121, Issue: 1, 2012); SMPTE, 2012. Available at <a href="https://doi.org/10.5594/j18133" target="_blank" rel="noopener">https://doi.org/10.5594/j18133</a></span>
SMPTE's HTML Pub
Preview:
M. J. Addis, M. Jacyno, M. Hall-May, M. McArdle, and S. C. Phillips; Planning and Managing the “Cost of Compromise” for AV Retention and Access, SMPTE Journal ( Volume: 121, Issue: 1, 2012); SMPTE, 2012
doi: 10.5594/j18133
url: https://doi.org/10.5594/j18133
doi: 10.5594/j18133
url: https://doi.org/10.5594/j18133
Snippet:
<li> M. J. Addis, M. Jacyno, M. Hall-May, M. McArdle, and S. C. Phillips; <cite id="bib-10-5594-j18133">Planning and Managing the “Cost of Compromise” for AV Retention and Access</cite>, SMPTE Journal ( Volume: 121, Issue: 1, 2012); SMPTE, 2012 <span class="doi">10.5594/j18133</span> </li>