API Registry JSON CSV exports Resources
Theme

Choose how MSRBot.io looks on this device.

Preference is stored in this browser only.

SMPTE Journal ( Volume: 121, Issue: 1, 2012)
[ACTIVE]

Planning and Managing the “Cost of Compromise” for AV Retention and Access

Metadata

Publisher
SMPTE
Doc Type
Journal Article
Article Type
orig-research
Abstract
Long-term retention and access to audiovisual (AV) assets as part of a preservation strategy inevitably involve some form of compromise in order to achieve acceptable levels of cost, throughput, quality, and many other parameters. Examples include quality control and throughput in media transfer chains; data safety and accessibility in digital storage systems; and service levels for ingest and access for archive functions delivered as services. We present new software tools and frameworks developed in the PrestoPRIME project that allow these compromises to be quantitatively assessed, planned, and managed for file-based AV assets. Our focus is how to give an archive an assurance that when they design and operate a preservation strategy as a set of services, it will function as expected and will cope with the inevitable and often unpredictable variations that happen in operation. This includes being able to do cost projections, sensitivity analysis, simulation of “disaster scenarios,” and to govern preservation services using service-level agreements and policies.
Publication Date
2012-01-01
DOI
10.5594/j18133
Link
https://doi.org/10.5594/j18133
Author(s)
M. J. Addis, M. Jacyno, M. Hall-May, M. McArdle, S. C. Phillips
Source Data (JSON)

Full registry record with provenance metadata. Open directly: /api/doc/10.5594-j18133.json

Reference this Doc

Plain text (ISO 690 compliant)

Preview:
M. J. Addis, M. Jacyno, M. Hall-May, M. McArdle, and S. C. Phillips; Planning and Managing the “Cost of Compromise” for AV Retention and Access, SMPTE Journal ( Volume: 121, Issue: 1, 2012); SMPTE, 2012. Available at https://doi.org/10.5594/j18133
Snippet:
M. J. Addis, M. Jacyno, M. Hall-May, M. McArdle, and S. C. Phillips; Planning and Managing the “Cost of Compromise” for AV Retention and Access, SMPTE Journal ( Volume: 121, Issue: 1, 2012); SMPTE, 2012. Available at https://doi.org/10.5594/j18133

HTML (ISO 690 compliant)

Preview:
M. J. Addis, M. Jacyno, M. Hall-May, M. McArdle, and S. C. Phillips; Planning and Managing the “Cost of Compromise” for AV Retention and Access, SMPTE Journal ( Volume: 121, Issue: 1, 2012); SMPTE, 2012. Available at https://doi.org/10.5594/j18133
Snippet:
<span class="citation">M. J. Addis, M. Jacyno, M. Hall-May, M. McArdle, and S. C. Phillips; <cite>Planning and Managing the “Cost of Compromise” for AV Retention and Access</cite>, SMPTE Journal ( Volume: 121, Issue: 1, 2012); SMPTE, 2012. Available at <a href="https://doi.org/10.5594/j18133" target="_blank" rel="noopener">https://doi.org/10.5594/j18133</a></span>

SMPTE Icon SMPTE's HTML Pub

Preview:
M. J. Addis, M. Jacyno, M. Hall-May, M. McArdle, and S. C. Phillips; Planning and Managing the “Cost of Compromise” for AV Retention and Access, SMPTE Journal ( Volume: 121, Issue: 1, 2012); SMPTE, 2012
doi: 10.5594/j18133
url: https://doi.org/10.5594/j18133
Snippet:
<li>
M. J. Addis, M. Jacyno, M. Hall-May, M. McArdle, and S. C. Phillips; <cite id="bib-10-5594-j18133">Planning and Managing the “Cost of Compromise” for AV Retention and Access</cite>, SMPTE Journal ( Volume: 121, Issue: 1, 2012); SMPTE, 2012
<span class="doi">10.5594/j18133</span>
</li>